Inspection
1. |
Remove the fuse box cover.
|
2. |
Remove the starter relay(A).
|
3. |
Using an ohmmeter, check that there is continuity
between each terminal.
|
4. |
Apply 12V to terminal 85 and ground to terminal 86.
Check for continuity between terminals 30 and 87.
|
5. |
If there is no continuity, replace the starter relay.
|
6. |
Install the starter relay.
|
7. |
Install the fuse box cover.
|
Center console storage
To open the center console storage, pull up the lever. ...
Description
Continuous Variable Valve Timing (CVVT) system advances or
retards the valve timing of the intake and exhaust valve in accordance with
the ECM control signal which is calculated by the engine ...
Headlamp delay
If you turn the ignition switch to the ACC or OFF position with the headlights
ON, the headlights remain on for about 20 minutes. However, if the driver’s door
is opened and closed, the headligh ...