Inspection
1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Turn the ignition switch ON.
|
3. |
Measure the output voltage of the APS 1 and 2 at
C.T and W.O.T.
|
Actual Measurement Dimensions ( 4Door )
Front side member tooling hole (Ø6.6)
Side cover mounting hole
(B/B’: Ø6.6/ Ø8.6)
...
SRS Control Module (SRSCM). Description and
Operation
Description
The primary purpose of the SRSCM (Supplemental Restraints System Control
Module) is to discriminate between an event that warrants restraint system deployment
and an event that d ...
ECM Problem Inspection Procedure
1.
TEST ECM GROUND CIRCUIT: Measure resistance between
ECM and chassis ground using the backside of ECM harness connector as
ECM side check point. If the problem is fo ...