1. |
Turn the ignition switch OFF and disconnect the battery
negative (-) cable.
|
2. |
Lift the vehicle.
|
3. |
Remove the fuel tank. (Refer to "Fuel Tank" in this
group.)
|
4. |
Disconnect the vapor tube quick-connector (A) and
the vapor hose (B).
|
5. |
Remove the canister assembly after removing installation
bolts (C).
|
Inspection
1.
Check the components for damage or deformation.
2.
Compress and extend the piston and check that there is no abnormal
resistance or unus ...
Instrument Cluster. Components
and Components Location
Components
...
Wheel. Repair procedures
Hub Nut Tightening Sequence
Tighten the hub nuts as follows.
Tightening torque :
88.3 ~ 107.9N.m (9.0 ~ 11.0kgf.m, 65.1 ~ 79.6lb-ft)
...